2013: Lotus – by Terrence Karpowicz

Lotus - by Terrence Karpowicz

Lotus – by Terrence Karpowicz

 

Metal Lotus – by Terrence Karpowicz

Installed: Sep 25, 2013.

Location: 360 W. Hubbard Street.

Commissioned by the Habitat Company in conjunction with Hubbard Place Development

Check out Terrence Karpowicz website.. Karpowicz Studio, click here..

 


 

Installation of Lotus

Installation of Lotus

 

On a beautiful autumn day, Set 25, 2013, Lotus was installed at 360 W. Hubbard Street.

Vector Fabricating was closely involved with the installation process.

For installation images.. . click here..

 


 

Here is a photo Documentation of the different Stages of fabrication of Lotus..

Fabrication of Metal Lotus – by Terry Karpowicz

 


 

August, 2013

 

Assembly of 8" Pipe Sections - Derick Malkemus

Assembly of 8″ Pipe Sections – Derick Malkemus

 

 


 

July 2013

 

Fitting the 12" Pipes -  Derick Malkemus

Fitting the 12″ Pipes – Derick Malkemus

 

 


 

June 2013

 

Fitting the Sections - Barry Hehemann & Derick Malkemus

Fitting the Sections – Barry Hehemann & Derick Malkemus

 

 


 

June 2013

 

 


 

April 2013
Steel Pipes being Rolled at Chicago Metal Rolled Products [CMRP].. click here..

 

 


 

March 2013

 

3-D rendering by Seth Goddard

3-D rendering by Seth Goddard

 

3-D rendering by Seth Goddard

 

3-D rendering by Seth Goddard

3-D rendering by Seth Goddard

 

 

 


 

Rendering by Ceyda Akosman [March 2013]

 

 


 